Build the upgrade around the installed system.
A controls lifecycle review starts with existing hardware, software records and the machine’s requirements. The scope should make the proposed change and its dependencies clear.
Useful inputs
- Current control-system references and available drawings.
- Known lifecycle concerns and the change the plant needs.
- OEM requirements, interface questions and responsible reviewers.
